2009 electricity generation return for accredited power stations

Version 1.0
Office of the Renewable Energy Regulator, November 2009

PDF and Word files

About the document

The '2009 Electricity Generation Return – For Accredited Power Stations' (the return) must be completed by the Nominated Person for each power station that was accredited with the Office of the Renewable Energy Regulator (ORER) on or before 31 December 2009, as specified under Section 20 of the Renewable Energy (Electricity) Act 2000 (the Act).

A separate return must be submitted for each power station accredited with the ORER including those power stations with nil generation in 2009.

Under Section 20 of the Act the original signed 2009 Electricity Generation Return must be submitted by close of business Monday 15 February 2010. Under Section 30E(1) of the Act the Regulator may suspend the accreditation of a power station if the return is not provided by this date. Please see Page 2 for legislative reference.

Please submit (by post) completed returns to:

Office of the Renewable Energy Regulator
GPO Box 621
Canberra ACT 2601

The ORER advises respondents that faxing the return to 02 6159 7780 is undertaken at their own risk, as security cannot be guaranteed and original signed hard copies are required to be lodged by the due date.

The Office of the Renewable Energy Regulator can be contacted by:

Phone: (02) 6159 7700
Email: orer@orer.gov.au

Cover of 2009 electricity generation return for accredited power stations

Before you download

Most publications are downloadable as PDF files. Adobe Acrobat Reader  is required to view PDF files.

If you are unable to access a publication, please go to our PDF help page, or contact us to organise a suitable alternative format.

Key

   Links to an another web site
   Opens a pop-up window